If in your apartment or a summer house regularly remove the ceiling, walls or on them constantly raw spots appear and subsequent as a result required the formation of mold, before in
For single-storey brick and stone buildings reasons There can be only two: incorrect foundation waterproofing or illiterately performed system of drain water with roofs of these buildings. If your case is the second, then you follow the design of the rope water removal with roofs to repair, and the external lower parts of the stone or brick walls of these buildings are further carefully plastered. This additional plaster must be height within 60 to 80 cm from the beginning of the foundation of the house. Its external part can be separated by decorative cladding - Maramina crumb, which once again emphasizes the originality and beauty of the whole construction as a whole.
Especially thoroughly sharpen attention to the breakfast. The most basic condition for good storage of the foundation and for dry wallsit is a strong protection against rain and surface waters. This feature performs precisely. She is obliged to have a weak bias from all the walls and get rainwater from home. If your scene is made not correctly or over time, it should be completely replaced.
It should be known that the scene is performed from the walls of the house in a width of at least one meter, and a good material for its fill is fatty clay thoroughly smeared. Around the house in advance dig up a 10-15 cm. Place your clay in it. There is a slope of about 7-9 degrees, water from the walls of the house will be drained. On the clay on top it is necessary to put sand with a thin layer mixed with gravel and a little tamper.