Many of us holy observe the tradition of going to walk in a famous film to the bath. You can, of course, go to the city sauna, but is it compare with a real village bathhouse? Those who decided to acquire this inexhaustible source of good health, readers will be useful.
I am a regular reader of your wonderful magazine, thanks to which many dachants have the opportunity to show their ideas, as well as apply interesting findings of other masters.
I also want to share the experience, as I managed to build a mini-bath, building a small room under the steam building in the economic building.
The size of the steam room turned out to be small: 2.5 × 1.5 m. In advance, the design was not created, there was only one idea: whatever I wanted to see my bathhouse. I wanted to build something beautiful and original, so from buying boards for regiments and doors for the bath I decided to refuse. It was necessary to make them themselves, on the planks of the sawing trunk of the aspen. So, all in order:
Installation of the furnace
In the room where the bath should be, I built a wall of a brick and a stone and put a bath oven. I brought a furnace fire on the street, having achieved several positive results: first, it is possible to drown the stove while visiting the bath, thereby keeping the temperature of the heated stones, and second, the steam of the bath is always clean, and from the stove smoke to the room Does not penetrate.
Insulation steaming
Then I began to insulate the steps. A steam barrier and a thickness of 10 cm insulation was laid into the frame walls, the insulation was fixed on the ceiling. This is important, because large heat leaks are through the ceiling occur.
After laying, the insulation was closed with a foil for a bath, whose joints I carefully blelled with a foil scotch, achieving the effect of the thermos.
Bath window
The next stage of construction is the installation of a bathroom with a double-glazed window that will avoid heat loss. It is important to consider that the window in the steam room performs not only its main function - ventilation, but also the decor element is, and also eliminates the effect of the closed space and creates
Door construction
Now it's time to make the manufacture of the door to the steam room. At first I made a frame for the door leaf, into which the insulation lay a layer of 5 cm laid and closed it with a foil from two sides. Then they were sewn to the frame of the boards from the aspen with a thickness of 2.5 cm. Since on the boards for the door I went sipped by me aspen, I had to tinker with the door, configuring the boards with each other. Also had to choose grooves for fitting More careful so in the future there was no cracks in the door. After that, from aspen, the door frame was made, handles made of small corping, and the door had a safely in its place.
Facing the walls and ceiling
Walls and ceiling in the room, I was crushed by aspen wagon. For the regiments was also selected aspen - the tree is most suitable for the bath, because it does not have a resin.
Comfortable shelves
From small segments, I made a base for the regiments, after which it was laid out with a thickness of 5 cm polished thoroughly boards, which I previously processed with special oil for ceilings.
Banged decor
The last stage is the decor of the room. From the residual pieces of the material, I built decorative platbands, layouts on the walls, on the door and window, as well as for a bath lamp wooden lampshade. Finally was done for the stove decorative lattice. Becoming I designed in the same style. Balke turned out very cozy, with a soft ferry, almost without heat loss.
Of course, if you are a master for all hands or you have a simple desire to build a bathhouse yourself, then you will easily make it yourself, but if there is no opportunity or time to do the construction, and I really want to have a bath on the site, you can contact the company "Stroymir 53 ", Which high quality and in a short time will put a turnkey bath. Turnkey baths from a bar - this is an excellent solution for those who are important time and there is no possibility to self-employed construction.